Pronksi Street reconstruction works continue in Tallinn City Centre; however, starting today, the Pronksi–Raua and Pronksi–Gonsiori intersections are open to traffic.
Tallinn Waste Centre and MTÜ Information Centre for Sustainable Renovation are opening a repair workshop in Pääsküla waste treatment plant today, where customers can repair various items which require welding, riveting, gluing, soldering or other means of repair under the direction of skilled masters.
Tallinn suspended mowing in city parks and green areas at the beginning of June to account for the dry period; however, it is now permitted to partially mow and remove by hand common orache and any other weeds whose spread inhibits the growth of more desirable, diverse green spaces.
The City of Tallinn project was among the 14 chosen by the European Urban Initiative from a total of 99 applications that will receive a five million euro grant from the Regional Development Fund.
Starting from 1 August, several bus line numbers and routes will be changed – the changes will affect lines number 5, 6, 8, 17, 17A, 35, 42, 43, 48, 67 and 68.
In 2021, a rooftop construction examination was conducted on 56 buildings in Tallinn to assess energy-saving possibilities. It was discovered that 28 buildings in the city can support solar power plants.
Tallinn City has successfully reached the end of talks with all landowners in the area for constructing a tram and pedestrian pathway connecting Vanasadama and the Rail Baltic to the Ülemiste Travel Terminal and ensuring its openness to the public.
Kursi Street and Põhja pst. intersections will be closed to traffic from 24 July to 30 September due to construction works on the Vanasadama tramway. The locations of the bus stops for bus lines 3, 66 and 73 will be relocated for the duration of the construction.