Münchhausen Productions OÜ will be conducting film shoots on September 9, 11, 16, 17, and 18 in the Kesklinn, Lasnamäe, and Nõmme districts. These shoots will cause temporary road closures for both vehicles and pedestrians. Traffic controllers will be present at all locations to assist local residents and other commuters.
From Monday, 3 July, the Narva mnt-Hobujaama-Laikmaa intersection will be closed as part of the next stage of the Vanasadam tramway construction. As such, tram lines 1, 2, 3 and 4 will be halted until the end of August. Viru terminal will be temporarily closed and public transport redirected.